Skip to Content

Case Studies

Documented challenges, solutions, and outcomes from real projects.

Full Shingle Roof Replacement for a Hyde Park Bungalow
Residential Replacement

Full Shingle Roof Replacement for a Hyde Park Bungalow

Hyde Park, FL

Roofing Demo replaced a failing 22-year-old asphalt shingle roof on a 1920s Hyde Park bungalow with a full architectural shingle system. The project included new underlayment, drip edge, ridge venting, and updated flashing throughout.

Outcome: The home came through the following storm season with no leaks and no callbacks. Attic temperatures dropped noticeably, and the homeowner reported that the second floor stayed cooler through July and August. The finished roof restored the bungalow's original curb appeal and passed the final municipal inspection on the first visit. The customer left a five-star review noting that the crew protected the landscaping and cleaned the property completely each day.

Storm Damage Roof Restoration After Hurricane Debris Impact
Storm Damage Restoration

Storm Damage Roof Restoration After Hurricane Debris Impact

Apollo Beach, FL

Roofing Demo restored a wind-damaged roof in Apollo Beach after a tropical system lifted shingle tabs and drove water into the attic. The scope covered emergency tarping, full documentation, and complete slope replacement.

Outcome: The claim was approved for the corrected scope and the homeowner's out-of-pocket cost stayed close to their deductible. No further water intrusion occurred during the storms that followed later that month. Interior drying readings returned to normal within four days, and the stained ceilings were repainted by the homeowner's painter. The family noted that the roof now looks uniform from the street and that the insurance process was far less stressful than they expected.

TPO Membrane Replacement for a Westshore Office Building
Commercial Flat Roof

TPO Membrane Replacement for a Westshore Office Building

Westshore, FL

Roofing Demo replaced a blistered modified-bitumen flat roof with a fully adhered TPO membrane system on a two-story Westshore office building. The project included new insulation, tapered drainage, and upgraded edge metal.

Outcome: Ponding water disappeared and the roof has drained freely through two rainy seasons without a single leak report. The property manager received a complete photo log, warranty documents, and as-built drainage notes for the owner's records. Interior musty odors resolved once the saturated insulation was removed, and the affected ceiling tiles were replaced. The building owner has since asked Roofing Demo to survey two other properties in the portfolio.

Historic Slate Roof Restoration on a Ybor City Landmark
Historic Slate

Historic Slate Roof Restoration on a Ybor City Landmark

Ybor City, FL

Roofing Demo restored the slate roof of a historic Ybor City building, salvaging original tiles and rebuilding copper flashing to match the period detail. The work was completed in coordination with local historic preservation requirements.

Outcome: The roof now reads as a continuous, period-correct slate field with no modern shingles interrupting the visual line. Interior water staining stopped completely after the first heavy rain following completion, and the parapet flashing has stayed dry. The preservation reviewer approved the completed work without requiring revisions. Building ownership noted that the restored roof has become a point of pride in the district and has increased interest from prospective tenants.

Standing Seam Metal Roof for a Seminole Heights Home
Metal Roof

Standing Seam Metal Roof for a Seminole Heights Home

Seminole Heights, FL

Roofing Demo installed a standing seam metal roof on a Seminole Heights craftsman home, replacing worn three-tab shingles. The system was chosen for longevity, wind resistance, and reduced cooling load.

Outcome: The porch has stayed completely dry through multiple summer downpours. The homeowner measured a noticeable drop in afternoon upstairs temperatures and reported a lower cooling bill in the first full summer after installation. The concealed-fastener system carries a wind rating well above what the previous shingles offered, giving the family confidence through hurricane season. They noted that the roof's clean vertical lines modernized the home while still fitting the craftsman style of the block.

Targeted Leak Repair Around a Carrollwood Chimney
Roof Repair

Targeted Leak Repair Around a Carrollwood Chimney

Carrollwood, FL

Roofing Demo traced and repaired a persistent leak around a Carrollwood chimney that had defeated two previous contractors. The repair focused on failed counter flashing and a cracked chimney crown.

Outcome: The ceiling stain has not returned through two full storm seasons, confirming the source was correctly identified. Interior moisture readings taken after repair came back dry, and no further drywall damage occurred. The homeowner appreciated receiving dated photographs of the flashing detail for their records in case of a future sale. They have since referred two neighbors to Roofing Demo for roof inspections.

Skylight Installation to Brighten a Davis Islands Kitchen
Skylight Installation

Skylight Installation to Brighten a Davis Islands Kitchen

Davis Islands, FL

Roofing Demo installed two fixed skylights over a Davis Islands kitchen to bring in daylight without adding wall windows. The installation included new curb framing, flashing, and a solar-powered venting unit in an adjacent bath.

Outcome: The kitchen now receives natural light through the entire day, and the homeowner no longer needs artificial lighting during daytime cooking. No condensation has appeared inside the shafts through the humid summer months, confirming the insulation detail worked. The venting skylight in the bathroom has measurably reduced lingering moisture after showers. The roof has remained watertight through repeated heavy rain, and the homeowner reported that the openings look like original architectural features.

Multi-Building Roof Replacement for a Channelside Condominium Association
Multi-Unit Roofing

Multi-Building Roof Replacement for a Channelside Condominium Association

Channelside, FL

Roofing Demo replaced the roofing on four connected residential buildings for a Channelside condominium association. The phased project covered shingle replacement, flat roof sections, and shared drainage improvements.

Outcome: All four buildings were completed on budget and within the two-year phasing the board needed. No new leaks have been reported in any of the eight previously affected units across the following storm season. The re-pitched breezeway section now drains correctly, ending the chronic water pooling that had been eroding the coating. Unit owners reported that the crew was respectful and that the site was clean every evening. The board has placed Roofing Demo on its approved contractor list for future maintenance work.

No case studies found.